Work plan assignment overview
- Genesys Cloud CX 1 WEM 附加组件 II、Genesys Cloud CX 2 WEM 附加组件 I、Genesys Cloud CX 3 或 Genesys Cloud EX 许可证
- Workforce Management > Work Plan > View permissions
- Workforce Management > Business Unit > View permissions
- Workforce Management > Management Unit > View permissions
- Workforce Management > Agent > View permissions
- Groups > Work Team > View permissions
劳动力管理通过工作计划分配,管理员可以主动为代理分配选定日期范围内的工作计划。管理员不需要等到特定日期才手动修改代理的工作计划。他们可以做出立即生效或在将来某个日期生效的更改。
-
Week 1 (current week) – Late shifts
-
Week 2 (next week) – Early shifts
-
Week 3 – Early shifts
-
Week 4 – Early shifts
-
Week 5 – Early shifts
-
Week 6 return to Late shifts
The administrator creates the work plan assignments to include the change in the agent’s work plan schedule. Workforce management overrides the default work plan with the modification made in the Work Plan Assignments page. The future date changes automatically take effect on the chosen date and after the end date of the change is met, the original work plan comes back into effect.
Work plan overrides take precedence over the settings in the Work Plan Rotations and Work Plan Configurations pages, during the specified date range.
An administrator can temporarily change the work plan of an agent who is on an early shift work plan with a late shift work plan for a selected period as indicated in the following table.
An administrator can manually change the work plan or change via a work plan bid of the agent from work plan A to work plan C on week 5. This change is made in week 1 so that the future schedules generate accordingly. A work plan override bridges the time between the default work plan that is being changed and when the agent’s schedule should reflect the change.
In this instance, the agent’s default work plan is A and is working on a four-week rotation in weeks 2–5. Now the work plan is scheduled to change to work plan C for week 6. This work plan change can be manually done or changed via a work plan bid. The change is made in week 1 so that future schedules can be generated.
A work plan override bridges the time between the change in the default work plan being and the start of work plan rotation. When the work plan rotation ends at the end of week 5, the agent’s work plan automatically changes to work plan C as planned.
For more information about Work Plan Assignments, see the following articles:
Task | 描述 |
---|---|
导航工作计划分配页面 |
View the list of agents and details of their work plan assignments. |
管理工作计划任务 | Change the existing work plan assignments, including deleting existing, assigning new work plans to the agent’s schedules. |